Toronto · Peel · Halton · Hamilton · Niagara

Helical piles for decks, additions and underpinning.

Engineered screw piles that carry load the moment they are in, with a torque log for your permit. No excavation, no curing time.

22

municipalities served, Toronto to Fort Erie

1 business day

to call you back on every request

Free

quote, with a firm price once we have seen the plan or the site

What we put piles under

Decks, porches and pergolas
Piles driven along each beam line, with a saddle bracket on top ready for the post. Because there is no concrete to cure, framing can start the same day.
Additions and sunrooms
Larger-shaft piles for structural loads, laid out to the engineer's drawing, with the sealed certificate of conformity and torque log your permit needs.
Underpinning and foundation repair
Brackets on the existing footing, carried by piles to competent ground, to stop a settling wall. Whether it can be lifted back is the engineer's call after the site assessment, which every underpinning job starts with.

We also anchor boardwalks, retaining walls and light structures. Ask.

Why helical piles instead of concrete

Concrete pier versus helical pile in frost-prone ground Cross-section. On the left, a concrete sonotube pier sits with much of its length inside the frost zone; freezing soil grips its rough sides and lifts it. On the right, a helical pile's smooth galvanized shaft passes through the frost zone and its helix plate bears in undisturbed soil below it. Deck beam Grade Frost zone to 1.2 m Undisturbed soil 1 Concrete sonotube 2 3 Helical pile
  1. Frozen soil grips the rough sides of a concrete pier and lifts it.
  2. A smooth galvanized shaft gives frost far less to grip.
  3. The helix bears in undisturbed soil below the frost zone.
Not to scale. Concrete piers give frost a rough surface to grip; a helical pile's smooth shaft gives it far less, and its helix bears below the frost zone. 1.2 m is the minimum pier depth on Halton municipalities' own deck drawings.
  • Load-bearing the moment it is in. No cure time, so the deck or addition is framed the day the piles go in, not two days later.
  • Capacity you can read off a gauge. Installation torque is recorded for every pile as it goes in and correlated to load capacity using the torque tables in the pile's CCMC evaluation report. The log is what the engineer certifies from.
  • No excavation. Compact tracked drive units are built to get through a backyard gate; the narrowest on the market is 29 inches wide. There is no dug hole, no spoil and no concrete delivery.
  • Anchored below the frost zone. Frost grips a rough concrete pier far harder than a smooth galvanized shaft. The helix bears below the local frost depth, so seasonal frost has little to lift and little to lift with. Frost movement is designed against, not wished away.

How it works

  1. Tell us the project

    Use the form or call. A deck plan, a sketch with dimensions, or photos of the yard and the gate are enough to start. Drawings from your builder or engineer are better.

  2. Layout and firm quote

    Decks are usually quoted from the plan; additions and underpinning get a site review first. Where your permit needs it, an engineer sets the pile depth, spacing and size for the soil, and that layout goes in with the application.

  3. Install day

    A compact tracked drive unit screws each pile in with a hydraulic torque head until it reaches the torque the engineer specified. The reading on every pile is recorded as it goes in. There is no excavation and nothing to haul away.

  4. Build the same day

    Helical piles carry load as soon as they are in. The engineer issues the sealed certificate of conformity from the per-pile torque log, which is what your permit file needs, and framing can start.

What it costs, illustratively

Ranges from our current price table, per pile installed. Each site carries its own conditions, so treat these as examples and the written quote as the price.

ApplicationTypical shaftIllustrative range
Deck or porch 2 to 2‑3/8 in round shaft $325 to $475 per pile installed
Addition or sunroom 2‑7/8 to 3‑1/2 in round shaft $575 to $875 per pile installed
Underpinning (pile and bracket) 2‑7/8 to 3‑1/2 in shaft with bracket $950 to $1,650+ per bracket and pile installed

Last reviewed 2026-09-25. Volume pricing on larger pile counts. Rock or shale pre-drilling, no gate access, heavy loads, frozen ground, travel on small jobs, and engineering and permit fees all sit outside the per-pile figure. Full breakdown, what other Ontario installers publish, and a budget calculator: Helical pile cost per pile in Ontario.

Where we work

We work across Toronto, Peel, Halton, Hamilton, Guelph and the Niagara corridor down to Fort Erie.

Questions people ask

Do I need a permit for a deck on helical piles?

Usually, yes. Each municipality sets its own threshold by deck height and area; in Oakville, a deck over 10 square metres and higher than 61 cm, or any deck attached to the house, needs one. Oakville asks for the pile manufacturer's CCMC evaluation report and an engineer's layout with the application, and Burlington lists BMEC approvals or Minister's Rulings for helical piles. We prepare the application package with you.

Can you install in winter?

Yes, year-round. Helical piles are screwed in, not poured, so there is no concrete to cure and no weather window to wait for. In frozen ground the frost crust is pre-drilled with an auger or thawed first, which adds time and can add cost. Winter is a scheduling question, not a quality one.

How deep do the piles go?

Below the frost zone and into soil that can carry the load. Every pile is screwed in until it reaches the torque the engineer specified, so the depth is set by the ground, not by a fixed number. Halton building departments draw conventional deck piers at a minimum 1.2 m below grade, and a pile's helix has to bear below that depth.

Will you tear up my lawn?

Very little. A compact tracked drive unit does the work, and a pile leaves a hole the width of its shaft. There is no excavation, no spoil pile and no concrete truck, so the lawn is walked on rather than dug up. Tell us if the route to the yard is soft or narrow and we plan for it.

What if you hit rock or hard shale?

Oakville sits on shale, and along Sixteen Mile Creek and Bronte Creek it is at or near the surface; other towns are confirmed on site. The torque reading tells us when a pile has found its bearing. Where shale is shallow the pile is pre-drilled or sized differently, and the engineer confirms the capacity. If a site needs something other than what the quote assumed, we tell you before the price changes.

Are the prices on this site firm?

No. Every price here is an illustrative range from our current price table. Each site carries its own conditions: soil, access, loads and travel all move the number. The firm price is the written quote after we have reviewed the job, and that is the number you pay.

Ready for a firm price?

Tell us the project and we call you back within one business day. Free, and no obligation.