Per pile, installed, in the western GTA. The ranges here are illustrative: every site carries its own conditions, and the firm price is the written quote after a site review. This page shows our table, what other installers publish, what moves the number, and a calculator.

Our illustrative ranges

ApplicationTypical shaftIllustrative range
Deck or porch 2 to 2‑3/8 in round shaft $325 to $475 per pile installed
Addition or sunroom 2‑7/8 to 3‑1/2 in round shaft $575 to $875 per pile installed
Underpinning (pile and bracket) 2‑7/8 to 3‑1/2 in shaft with bracket $950 to $1,650+ per bracket and pile installed

Illustrative ranges only. Each site carries its own conditions: soil, access, loads and travel all move the number. The firm price is the written quote after a site review. Engineering and permit fees are listed separately in the quote. Volume pricing on larger pile counts.

What other Ontario installers publish

Public figures retrieved 2026-09-25, so you can see where our ranges sit. Installer and contractor pages are the better evidence; aggregators and manufacturer FAQs are listed for completeness.

SourcePublished figure
City Wide Post Hole Digging (Toronto installer)
installer page
$300-$600 per pile installed; residential projects $2,000-$6,000
GAMCON (Toronto contractor)
contractor page
$300-$700 per installed pile; decks ~$300-$500; additions ~$400-$700; underpinning $800+; mobilization minimum ~$800 downtown; extensions $15-$30/ft
The Post Hole Diggers (York Region / GTA installer price list)
installer price list
helical pile installation from $350 per pile; area minimum charges $400-$800 (Oakville/Milton/Georgetown $650)
Screw Piles Quotes, Toronto page (aggregator)
lead-gen aggregator
decks/porches $300-$500; additions/sunrooms $400-$700; underpinning can exceed $800 per pile; engineering/permits $100-$500
Screw Piles Quotes, cost guide (aggregator)
lead-gen aggregator
$300-$600 per pile; unit cost could drop based on volume
Screw Piles Quotes, London ON page (aggregator)
lead-gen aggregator
$300-$650 per pile, about $500 typical; $150-$350 of that is installation
Postech Screw Piles FAQ (manufacturer; currency not stated)
manufacturer FAQ, currency unstated
$150-$300 per pile installed; standard deck (8-10 piles) $1,200-$2,500
Techno Metal Post FAQ (manufacturer, Canada)
manufacturer FAQ, no numeric range
deck or addition pile 'a few hundred dollars'; five-storey building pile 'several thousand dollars'
Foundation Fix (Southern Ontario foundation-repair contractor blog, 2025-10-30)
contractor blog
helical piers $2,000-$5,000 per pier; full project $10,000-$50,000+; structural engineer report $800-$2,500

Deck piles at $325 to $475 sit inside the published band. Our addition and underpinning ranges sit at or above most published figures. The written quote states exactly what the per-pile price includes.

What moves the price

Shaft size and load
A deck pile is a 2 to 2-3/8 inch shaft carrying a post. An addition pile is 2-7/8 to 3-1/2 inches, and underpinning adds a bracket that clamps to the footing. More steel and more torque is the first thing that moves the price.
Depth and extensions
A pile is driven until it reaches its design torque, so the ground sets the depth. Where bearing soil is deep, extension sections are added; one Toronto contractor publishes $15 to $30 per foot beyond about 7 ft.

Source: GAMCON

Shale and rock
Oakville sits on shale, and in its creek valleys it is near the surface; other towns are confirmed on site. A pile that hits refusal early is pre-drilled or resized, and the engineer confirms capacity from the torque record. That is extra time on site.

Source: Ontario Geological Survey, MRD 128

Access
Compact tracked drive units are built for backyards; the narrowest on the market is 29 inches wide. Where even that cannot get in, portable equipment does the job more slowly.

Source: Techno Metal Post equipment

Frozen ground
We install year-round. In winter the frost crust is pre-drilled with an auger or thawed first, which adds time and can add cost.

Source: Techno Metal Post FAQ

Travel and small jobs
Public GTA installers publish minimum charges of roughly $400 to $800 by area rather than folding travel into the per-pile price; one lists $650 for Oakville, Milton and Georgetown. Expect a minimum on a very small job.

Source: The Post Hole Diggers price list

Engineering and permits
The engineer's layout and sealed certificate are separate from the pile price. Aggregators put engineering and permit costs at $100 to $500; a structural engineer's report for foundation repair runs $800 to $2,500 per a Southern Ontario contractor. Oakville's 2026 deck permit fee is $220.

Source: Screw Piles Quotes

How many piles a deck needs

A pile goes under every post. As an illustration, with posts about every 8 ft along each beam and a beam line about every 8 ft across the depth, a 16 by 12 ft deck attached to the house on one side takes 6 piles: three along each of two beam lines, the third side carried on the house ledger. Freestanding, the same deck takes 9. A 20 by 16 ft attached deck takes 8. Your drawings govern; the calculator below uses the same rule.

  • 16 × 12 ft, attached: 6 piles, $1,950 to $2,850
  • 16 × 12 ft, freestanding: 9 piles, $2,925 to $4,275
  • 20 × 16 ft, attached: 8 piles, $2,600 to $3,800

Illustrative, before engineering, permit and any minimum charge.

Budget calculator

Get an illustrative budget range

Pick the job, enter the size or the pile count, and see an illustrative range from our current price table. Every site is different: soil, access, loads and travel all move the number. The firm price follows a site review.

What are we supporting?
Deck size

Or, if your drawings show a pile count:

Pile count

Illustrative ranges from our price table, last reviewed 2026-09-25. They are examples, not a quote: each site carries its own conditions. The deck layout assumes posts about every 8 ft along each beam; your drawings govern. Deck piles $325 to $475 each; addition piles $575 to $875; underpinning $950 to $1,650+ per bracket and pile.

Cost questions

Why ranges instead of a price?

Because each site carries its own conditions. Two 16 by 12 decks a street apart can differ by soil, depth to bearing, access and season. The ranges are illustrative examples from our current price table; the firm price is the written quote after we have looked at the job, and that is the number you pay.

Is engineering included in the per-pile price?

The engineer's layout and sealed certificate of conformity are listed separately in the quote, as are permit fees, so you can see them. Oakville requires an engineer's determination of depth, spacing and size with a helical-pile permit application, so budget for it on any permitted job.

Do prices change by city?

The per-pile ranges are the same across our area. What changes is the ground and the travel: shallow shale in parts of Oakville can mean pre-drilling, and a very small job far from base is subject to a minimum charge that a larger pile count absorbs. The written quote shows both.

What does underpinning really cost?

Per bracket and pile, our illustrative range starts at $950 and runs past $1,650. Published Ontario figures run from $800 per pile for the pile alone to $2,000 to $5,000 per pier for full foundation-repair scope, with a structural engineer's report of $800 to $2,500 on top. Underpinning always starts with a site assessment, and the quote states exactly what is in it.

When does a job get volume pricing?

Volume pricing applies on larger pile counts, because mobilisation and engineering are spread across more piles. There is no fixed threshold on this page; send your drawings with the pile count and we quote the job as a whole rather than pile by pile, and the quote shows the per-pile figure it works out to.

How does this compare with concrete sonotubes?

A sonotube costs less in materials and more in everything else: a dug hole to 1.2 m, concrete, curing time before you can build, and a footing inspection before the pour. A helical pile carries load the same day and leaves nothing to haul away. On a deck the totals can land close; where access is poor or the schedule is tight, the pile is usually the cheaper route once you count the extras.

Sources